Complete Accessory Dwelling Unit Build.
We loved working on this ADU project!
When we first met with the Homeowner, he came prepared with Architectural Blueprints/Plans for the project, and was ready to proceed with obtaining the permits from the city of Pasadena! Fantastic.
After patiently waiting for the city to approve the plans and issue the permits in order to break the ground on the project, they finally were approved, and we were ready to begin!
Then entire ADU building process took roughly nine months to complete; from ground breaking to final inspection, and loved every moment while working on this project.
This project followed the typical ADU building process of; Foundation; Framing, Framing, Exterior, Plumbing, Electrical, Drywall, and then the Interior.
We can not thank the Homeowner enough for choosing ING Construction to assist them with their project.
Architectural Blueprints, Slab, Foundation, Framing, Drywall, Insulation, Windows, Doors, Kitchen, Bathroom, Bedroom, Flooring Installation, Kitchen Cabinets, Kitchen Island, Kitchen Countertops, Gray, White, Sinks, Backsplash, Tile, Tile Installation, Washer and Dryer, Front Porch, Ceiling Fans, Baseboards, Shower, Shower Doors, Vanity, Tile, Shower Heads and Faucets, White Tile, Blue Tile, Bathroom Mirror, Lighting, Toilet, Painting. Architect, Framer, Carpenter, Carpentry, Electrician, Plumber, Painter, General Contractor.