Complete ADU Build.
Architectural Blueprints/Plans per the project.
Exterior;
Framing, Drywall, Electrical, Plumbing, Roofing, Windows, Doors, Stucco, Carpentry and Paint.
Interior;
All Flooring (Tile and Vinyl), Access Lighting, Drywall, Ceiling Fans and a Paint.
Bathroom;
Creation of Shower area, Installation of all Shower Tile, Shower Door, Japanese Soaking Tub, Open Vanity, Concrete Floor and Epoxy Sealant, Fixtures & Faucets, Niches, Floating Vanity, and a fresh paint to finish.
Kitchen;
Installation of Vinyl Flooring, Kitchen Cabinets, Countertops, Appliances, Windows, Sinks, and a fresh Paint to finish.
All General Contractor, Carpentry, Electrical, Plumbing, and Painting needs per the projects requirements.